We're still here

Hi everybody. Are you still there?

It's been very long since we published our last post but, truth to be told, things in Barajuen hadn't moved much until recently. The rythm at the buildingsite has slowed down and we don't know why.

Nevertheless, all the partition walls inside are finished and the contractor has alredy placed all the tubes and pipes for the electrical and plumbing installations. Next step will be to cover it all with a layer of cork and concrete to install the pipes for the underfloor heating installation on top of it. After that they'll install de floor, cover the walls, put in place windows and doors, etc., etc. And most of it should be done by mid-novenber because the guys of the sauna-business already want to come and install it.


Here we've got the entrance area...

...the kitchen with the plumbing...

...the main water supply between the two floors...

...bathroom...

...bedroom...






Outside, they've also finished the facade that now only needs to be plastered (lower part) and painted.



No comments:

Post a Comment