Little by little we're finishing the structure of the ground floor.
Builders have finished the exterior wall, including the "zuncho" (kind of concrete beam with steel reinforcement built all around the perimeter on the upper part of the wall). They've also done part of the interior wall, as well as the filling of the chamber in between with exfoliated vermiculite, a kind of clay with very good thermal isolation properties.
Detail of the drainage piping and the geotextile fabric on the retaining wall.
Detail of the vermiculite filling in the double wall insolation space.
Sus and Donnou in our future sauna room.
View form our future bedroom.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment