The kitchen furniture and the appliances were brought last week and have started to be installed this week after we solved a couple of problems with some plugs and switches that were not in the right place.
Behind the kitchen, in a separate room, is the laundry-room, where we keep the washing machine, the deep freezer and some more storing space.
The washing-machine, as Susanne wanted, is elevated to make its use more comfy when loading and unloading its 8 Kg capacity.
Saturday, 5 March 2011
Thursday, 3 March 2011
Staircase (II)
Joseba has already installed the steps of the staircase. It's not completely finished yet but it is a very comfortable staircase. He's doing a good job.
He's also painted the structure of the staircase in white. Sorry for that one of you who didn't want to :-( but we really like it. It is much better integrated with the color of the walls and therefore the entire structure looks much lighter.
The open raisers also let the light from the window upstairs iluminate the floor downstairs as we had planned.
He's also painted the structure of the staircase in white. Sorry for that one of you who didn't want to :-( but we really like it. It is much better integrated with the color of the walls and therefore the entire structure looks much lighter.
The open raisers also let the light from the window upstairs iluminate the floor downstairs as we had planned.